Project Summary:

The landlord appointed us for detailed inspection of Arlington Stadium, in compliance with the terms of the lease. This involved a thorough inspection of both the exterior and interior. Key findings included surface and structural corrosion, concrete deterioration, and drainage issues, all requiring targeted repairs and monitoring.